Service provided

The Challenge

Melody VR is the destination for music in virtual reality. Fully backed by music & tech giants and currently boasting the world’s largest library of interactive music content, the team have worked with over 530 international artists to date. Melody VR is on a mission to enable music fans around the world to get closer to their favourite artists, through next-generation immersive technologies. They approached Technimove to provide a physical

  • De-Racked/Re-Racked 13x devices.
  • Moved PC users

The Solution

Planning and Project Management

Our migration methodology is designed to focus on minimising downtime, reducing risks and guaranteeing the efficient delivery of server migration projects. A key element of this process is ensuring that your project manager has prepared for the challenges and utilised the available resources in the most effective way.

The Migration

On the day of the migration, equipment was backed up and gracefully shut down, by the client, ahead of the Technimove Team’s arrival.

Technimove engineers began by preparing all packaging material required for the migration. Equipment was then De-racked before being individually wrapped in anti-static bubble wrap and placed into purpose built, foam lined, server flight cases.

 

Flight cases were secured in Technimove’s Mercedes GPS Tracked, solid sided vehicles before travelling directly to the destination site in London, where the Technimove team unloaded flight cases and moved them into position within the new facility.

The onsite client contact signed an equipment itinerary confirming that the devices had arrived at the destination facility before the devices were unpacked and Re-racked in line destination rack plans.

The Technimove engineers then hand over equipment to the client for the power up and testing to commence.

 

The Result

Technimove ensured that the migration was delivered and achieved all of the goals for the project. From the very beginning, the procedure we had put in place through our project management processes ensured the safe migration of their servers.

As a result, we delivered above and beyond expectations by;

– Early engagement with the client, ensuring that scope of work was agreed ahead of the migration.

– Managed expectations through regular contact leading up to the migration.

 

The Director said:

“They were top drawer, can’t thank you enough for your flexibility’’